¾ÅÐãÖ±²¥

Helensburgh CARS grants

Information about Helensburgh CARS grants

Priority buildings

Major repairs including structural and external repairs of the fabric

25-26 West Clyde Street was awarded a Priority Building Grant to comprehensively repair the fabric of the building. Works to repair the roof, rainwater goods and stone started in September 2024 and are due to be completed in summer 2025.

1-7 Colquhoun Street was awarded a Priority Building Grant to comprehensively repair the fabric of the building. Works to repair the roof, rainwater goods and stone started in September 2024 and are due to be completed in summer 2025.

Proposed works

The owners of two additional tenements are currently working towards making an application for grant to support substantial repairs to their properties. Repairs are likely to include full-scale roof repair/replacement, including rot works and lead work, as well as structural repairs, including stonework and repointing.  The proposed additional large-scale building repair projects are:

  • 22 – 34 Sinclair Street

  • 36 – 40 Sinclair Street

Shopfront repairs

Such as the reinstatement of traditional features and shopfront detail

The Scandinavian Shop received a new shopfront which looks elegant and showcases their wide variety of stock.

9 West Clyde Street received a new shopfront which aims to attract a new tenant. 

Did you find what you were looking for?

Why wasn't this information helpful

Limit to 250 characters.